StS is one of Norway’s leading suppliers within the ISS field and offer a vast range of services related to maintenance and modification.
Timeline

1972 The establishment
When Odd Strand discovered the new steel scaffolding system that came to Norway, he discovered how much easier and safer this could make his working day. He was the first in Western Norway to focus on the new system. Read more

1977: The Cooperation with Aker Stord starts
StS has been a permanent supplier of scaffolding and rope-access services, truck drivers, crane oper... Read more

1980`s Pioneers in Scaffolding
The transition from heavy steel to light aluminum scaffolding in 1983, is characterized as a pioneer... Read more

1980: the start of StS and CCB cooperation
CCB- Cost Center Base From its central location, CCB supplies both the Norwegian and British cont... Read more

1990`s- consolidation and modernization
Stillasservice ventured into the nineties with employees at a bare minimum, and lacking significant ... Read more

1994- Pioneers in the discipline of Rope Access technology (RAT) and industrial climbing
In 1994, the trade union was expanded to include industrial rope access personnel. Read more

1997 - First habitat
First habitat 1997 The development of StS Flexible Habitat solution came to fruition by a challen... Read more

Njord
The Njord field was built with a floating steel platform called Njord A. The platform was originally delivered by Kvaerner in September 1997. Read more

2000s: The modern 'StS Gruppen' takes shape - innovation and interdisciplinary focus
The service range is expanded with Surface and Insulation Read more

2002: First automatic shutdown system
First automatic shutdown system The oil companies and contractors wanted a more complex system, w... Read more

2003: First ISS contract for all Oseberg installations
Scope of work: Maintenance & modification assignments offshore in charge of scaffolding / rop... Read more

2007: Establishment of a subsidiary in the UK
First oversea establishment Recruitment of skilled professionals will characterize everyday life ... Read more

2010's: Exciting assignments
The 2010's can be summed up with exciting challenges on the Oseberg Field Center low-pressure projec... Read more

2011: StS focuses on NDT - a strategically important discipline
In mid-April, Anko AS and StS Engineering signed an agreement to acquire Ankos NDT business. The StS... Read more

2011: Development of insulation products
StS launches the brand name AnsaTekt, which is a common name of all prefabricated insulation product... Read more

2012: 40th anniversary
Serving the community for 40 years and counting For 40 years, StS has focused on the protection o... Read more

2012: StS assists in changing the topside deck at 'Njord'
In 2012, 'Statoil' implemented a comprehensive maintenance and modification campaign at 'Njord A'. '... Read more

2013-2014: Mongstad
Project: Frame agreement ISS Services Mongstad Client: Statoil Duration: 2012 - 2016 Discipline: I... Read more

2014: Oseberg Sør
Lifeboat change of 3 of lifeboats at Oseberg Sør. Work carried out in collaboration with Odfjell Drilling Technology and Schat Harding. Read more

2015: Johan Sverdrup
Performance of the entire scaffolding-scope during the fabrication and construction of the Johan Sverdrup Drilling Platform at Aibels Yard in Haugesund. Read more

2016: Ivan Crane
The assignment has been very varied with bolt shifting throughout the wreath tower, removal and installation of electrical cables and removal of engines on top. Read more

2016: Njord returns to Stord after 20 years in operation
The Njord field was built with a floating steel platform called Njord A. The platform was originally delivered by Kvaerner in September 1997. Read more

2017: Dvalin
Aibel will deliver two modules to Statoil's Heidrun platform as the sub-sea field Dvalin will be connected to. The work starts in August 2017 in Haugesund and will continue until delivery in 2019. Read more

2018: Haven
The leg extension project for Haven is a pioneer project in Europe. The scope has never previously been performed outside the Middle East. Read more

2019: Neptune Energy
In December 2018, StS signed a ISS contract with Neptune Energy Norge AS for Operations & Maintenance on the Gjøa platform. Read more

2020: Nordnes sea bath 110 years old!- StS Scaffolding
In connection with the 110th anniversary of Nordnes sea bath, StS built an extra high diving tower. Read more


2020: Vår Energi awards an ISO contract
ISONOR Industrier has in collaboration with StS been awarded the ISO contract for all of Vår Energi’s installations, Goliat, Balder, Ringhorne and Jotun A. Read more

2021: JOTUN A- a collaborative project
The production vessel Jotun FPSO has been producing oil from the Balder field in the North Sea since 1999. Read more

2021: StS gruppen and Al Masaood Oil and Gas
StS gruppen signs exclusive agency agreement with Al Masaood Oil and Gas for promotion of welding habitats and its related ATEX products and services for the UAE market. Read more

2022: StS celebrates 50 years in operation!
The whole adventure started in 1972 when three young men took the scaffolding department out of the walls – and the painting companies they ran. Read more
Pioneer
Competence
Safety
Office
Postal address
PO Box 6085 Bedriftssenter
5892 Bergen
Visiting address
Sandbrekketoppen 30, 5224 Nesttun
Contact us
Submit your phone number or email address and we'll get back to you.