Haven

coast center base
Scope

The leg extension project for Haven is a pioneer project in Europe. The scope has never previously been performed outside the Middle East.

Prosjekt:

Haven

Klient:

Coast Center Base (CCB)

Varighet:

2017 - 2018

Disiplin:

Tilkomstteknikk, stillas, habitat

Volum:

30 000 timer årlig

The scope of work includes a number of extremely complicated scaffolding designs with associated habitats, to extend the height of Haven's legs.

Scaffolds was erected in leg wells for cutting of lower section of legs, mainly suspended scaffold. In the middle of each leg well there were built suspended scaffold platforms as lay down area for three 1000 MT SWL grommet sling, each weighing 8 tons.

Scaffold towers was erected 12 meters above jacking houses on all four legs for cutting and welding of new upper leg sections. Overpressure habitats were installed at the scaffolds, to create optimal welding conditions.

Rope Access technicians have completed a series of complicated rigging operations, and in addition some major mechanical work. 288 meters of leg ladders was replaced (72 meters per leg) In addition new draught marks was punched and painted on all four legs.

Our rope access teams were involved in all minor and major rigging operations, for installation of strand jacks, double hooks and removal of excess equipment.

After completion of the project, Haven will work as Floatel on Johan Sverdrup hook-up project

Project preparation phase 7 months, Project execution 7 months.

Feedback/Result

Involvement in the planning phase and close integration with our customer CCB is the success factor during this Pioneer project. Experienced project management and site-team ensures delivery according to plan and budget.

Kontakt

Telefon
+47 55 20 80 00

E-post
firmapost@stsgruppen.com

Kontor

Postadresse
Postboks 6085 Bedriftssenter
5892 Bergen

Besøksadresse
Kanalveien 52 C, 5086 Bergen

Kontakt oss

Skriv inn telefonnummer eller e-post, så kommer vi tilbake til deg.